Match a scaffold platform to the load it will carry using OSHA’s light, medium and heavy duty ratings.

Short answerOSHA duty ratings are load per square foot: light 25 psf, medium 50 psf, heavy 75 psf. Capacity = platform area × duty rating; every scaffold must also support 4× the maximum intended load.

Want this on your own domain?

We build this calculator as an embeddable tool — engineered, SEO- and AI-ready, delivered in 5 business days for a flat $2,800.

Get yours in 5 days

How it's calculated

OSHA classifies scaffolds by uniform load: light-duty for inspection and light work, medium-duty for most trades, heavy-duty for masonry and stockpiling. Multiply the platform area by the rating to get capacity, keep the intended load below it, and confirm the 4:1 safety factor on the structure.

Capacity(lb) = Area(ft²) × Duty(psf) Structure safety factor ≥ 4 × max intended load
Worked example
  1. Platform 7 × 5 = 35 ft², heavy duty (75 psf).
  2. Capacity = 35 × 75 = 2,625 lb.

Reference tables

OSHA scaffold duty ratings

DutyUniform loadUse
Light25 psfinspection, light work
Medium50 psfmost trades
Heavy75 psfmasonry, stockpiling

A number the tables do not give: a 35 ft² heavy-duty platform is rated for about 2,625 lb of uniform load at 75 psf.

See a live tool in action

The interactive version of this calculator is on our build queue. Meanwhile, these live example simulators show exactly how yours would look and behave on your own domain:

Conduit Fill · NEC▶ LIVE CALCULATOR Storage Rack quote-simulator▶ OPEN DEMO Packaging / box simulator▶ OPEN DEMO

FAQ

What does the duty rating mean?

It is the maximum uniform load per square foot the platform is designed for; pick the class that matches the work.

What is the 4:1 rule?

Scaffolds and their components must be capable of supporting four times the maximum intended load without failure.

Do point loads change it?

Yes — concentrated loads (a stack of block) can exceed the uniform rating locally; distribute loads or use planking rated for them.

Does this replace an engineer?

For non-standard or high scaffolds, OSHA requires design by a qualified person. Treat this as a duty-rating check only.

This page is a reference aid. Always verify against OSHA 1926 Subpart L and the scaffold manufacturer data. Figures shown are for orientation, not a stamped design.

Build it for your catalog

Put this calculator on your domain so the engineers who run it land on your site — not a competitor's. See how it works or start the conversation.